RJ FleetWorks · INFRA

Estimates and change orders — built as a system for RJ FleetWorks.

Operational funnel for Estimates and change orders. Captures demand, routes to the RJ FleetWorks pipeline, and pulls Passport evidence when claims are made.

"Trucks back on the road, records back in the file." · Repair and maintenance

  • Scoped to RJ FleetWorks only — entity separation preserved
  • Lead form → ClientOS pipeline + LeadFlow
  • Passport / Evidence Vault for verified claims
  • 49 CFR Part 396 inspection/repair records. Only list services you can deliver.

49 CFR Part 396 inspection/repair records. Only list services you can deliver.

1342 NM 333, Tijeras, New Mexico 87059 · (866) 752-4618

Estimates and change orders

Connect with RJ FleetWorks

Routes to fleetrepair pipeline · [email protected]

More from RJ FleetWorks

1342 NM 333, Tijeras, New Mexico 87059 · (866) 752-4618 · Technology powered by RJ GrowthOS

Start: Estimates and change orders